A 60-day runbook for a model retirement notice
Anthropic's retirement announcements in 2026 gave about 60 to 62 days' notice, the minimum its policy allows (source). Sixty days is enough if you start on day one and plan the work. This runbook is a template for that plan. Adjust the weeks if your notice is longer; OpenAI, for example, gave a year for the Assistants API but only about three months for GPT-4.5-preview.
Overview
| When | Goal | Done when |
|---|---|---|
| Day 0 to 2 | Scope | Every call site is listed with an owner |
| Week 1 | Decide | Replacement chosen for each use, from the provider's notice |
| Weeks 2 to 4 | Migrate and test | Changes merged behind config, evaluations pass |
| Weeks 5 to 6 | Roll out | Production traffic on the replacement |
| Last 2 weeks | Clean up | Old ID gone from code, config, fallbacks and infrastructure |
Day 0 to 2: scope
- Confirm the facts on the provider's deprecation page: the exact IDs, the date and the recommended replacement. Copy the URL into your ticket.
- Check the platform. If you call the model through Bedrock or Vertex, find that platform's date too. It may differ. See why dates differ.
- Search the code in every repository using the grep method.
- Check actual usage with the provider's usage data (Anthropic offers a usage export). Compare: usage without a code hit means a runtime-built ID; a code hit without usage means a rarely run path.
- Assign an owner to each call site. One person owns the whole migration and the deadline.
Week 1: decide
- Pick the replacement per use, starting from the provider's recommendation.
- List known differences: request parameters (some newer models reject sampling parameters), context limits, pricing, output format.
- Note any contract, customer commitment or compliance review that names the old model.
Weeks 2 to 4: migrate and test
- Move the model ID behind config if it isn't already (see keeping model IDs in one place), so rollout and rollback are config changes.
- Run your evaluation set on old and new models; review the differences, not just the averages.
- Update prompts only where the evaluation shows a real regression.
Weeks 5 to 6: roll out
- Switch a share of traffic, watch error rates and user-facing quality, then switch the rest.
- Keep the old model available as a rollback for a short, fixed period only.
Last 2 weeks: clean up
- Remove the old ID from fallback chains, defaults, notebooks, evaluation scripts and infrastructure.
- Run the code search again. The goal is zero hits outside history and changelogs.
- Add a CI check so the ID can't come back.
- Write two lines in the ticket: what you would start earlier next time.
Printable checklist
- ☐ Provider notice URL, exact IDs, date and replacement recorded
- ☐ Platform dates checked (Bedrock, Vertex, Azure if used)
- ☐ Code search run in every repository
- ☐ Usage data compared with code search
- ☐ Owner per call site; one overall owner
- ☐ Replacement chosen and parameter differences listed
- ☐ Evaluation run and reviewed
- ☐ Rollout complete
- ☐ Old ID removed from fallbacks, notebooks, infrastructure
- ☐ CI check added